Foothill Place Apartments - Case Study

Very little roof access available
Pooling roof water caused water damage to apartments
Roof replacement in consideration of residents and strict construction schedule

Required installation prior to winter's arrival
Project coordination with siding, stucco, window, mechanical and painting contractors

Two to three buildings worked on simultaneously to meet construction deadline
Installations were completed without impact to residents

Thicknesses ranged from 1" to 26" to eliminate standing water
Mechanically attached TPO and dimensional shingle roof systems were completed on time and within budget
“CentiMark went above and beyond to make this project a success while accommodating and coordinating with all of the other trades and residents on-site. This was a very complicated project both technically and logistically. I use CentiMark because I know they will follow through on their promises and make the right decisions when delays or issues are encountered. The building owners use CentiMark because they know after the project is done, their warranty will be there to take care of any possible issues for the next 15 years. I would recommend utilizing CentiMark on any roofing project no matter the size or level of difficulty.” - E.B. Jackson Square Construction LLC