Saint Alphonsus Regional Medical Center - Case Study

Details
Multiple projects over 18 months
Regional Medical Center with high traffic patient environments
1/2" Fiberboard and 60-mil TPO on a high traffic medical building
Replacement of an IRMA roof with a Tapered Polyisocyanurate and EPDM Ballasted roof system
Challenges
Working sequentially on several roof systems
Complex project coordination and constant communication
High traffic areas required logistical constraints with pedestrian traffic
Sensitive patient environments
Solutions
Coordinated material staging during off hours utilizing small hydraulic hoists in lieu of cranes
Switched to low VOC materials and used HEPA filters over air intakes to limit volatile compounds infiltration into buildings
Much work performed during off-hours
Results
Overlay of existing BUR roof with installation of ½” Fiberboard and 60-mil TPO on high traffic medical office building
125 square overlay with 60-mil TPO mechanically fastened installed over North Tower
Met and exceeded the customer’s expectation

“We have never been so completely responded to like your company (CentiMark) has been doing over the past 10 months. The local manager and team of technicians have done a wonderful job of meeting our needs, and with gusto and energy we’ve not seen in any roofing vendor in quite some time.”   - G.S. Engineering Supervisor