Grubb and Ellis - Case Study

Details
Four-story building in high profile, congested urban area
60-feet high office building was fully occupied
Existing IRMA (Inverted Roof Membrane Assembly) roof system
Major water roof leaks impacting tenant spaces
Challenges
Limited access to roof due to tenant parking
Complete removal of existing rock ballast system without impact to building tenants
Installation required during winter and extreme cold
Solutions
16 dump truckloads of 2” river rock removed in 10 days
18,000 square feet of water-logged insulation removed
Roof access without use of building stairs or elevators
New fully adhered 2” ISO and 60 Mil white TPO installed
Results
Labor intensive project completed in less than 3 weeks
20-year reflective roof surface
Minimal disruption to tenants
Grubb and Ellis’ high expectations wet met and exceeded

Installation of the 2” ISO and 60 mil roof membrane commenced immediately after the roof surface was prepared. The installation was quick, accurate and according to specifications. CentiMark’s Project Manager and staff were timely, courteous, communicative and always available to me when I needed to reach them. We are happy with our new 20 year reflective roof surface. We know that CentiMark will be here in 20 years to honor our warranty and any service needs that we may have. I am confident in CentiMark’s ability to meet and exceed your expectations.”
- M.B. Grubb & Ellis/New Mexico